The list of some realized assembly actions (range-large) in the field of steel structures:
- steel constructions of the production halls Bosch Jihlava, Mikulov, Brno, České Budějovice (year 2000 – 2007)
- steel constructions , reconstruction of the paint shop, IVECO Vysoké Mýto (year 2001)
- steel construction of the press shop including crane tracks, Peugeot Paris (year 2002)
- steel technological platforms, TPCA Kolín (year 2003)
- steel construction of the production hall including crane tracks, KONE Ústí nad Labem (year 2004)
- sheating, IKEA Praha Černý Most (year 2004)
- steel construction of the production halls, KIA Žilina Slovakia (year 2005)
- steel footbridge, Praha Těšnov (year 2005)
- steel construction of the atrium, Prague Galerie Křižík (year 2005)
- steel construction of the building, Česana Auto Škoda Mladá Boleslav (year 2006)
- steel construction of the building, University Hradec Králové (year 2006)
- steel construction of the atrium and supplementaries structures , University Škoda Mladá Boleslav (year 2006)
- steel construction of the hall including cladding, Triga Lomnice nad Popelkou (year 2006)
- steel construction of the product halls, Hyundai Nošovice (year 2007 – 2008)
- steel construction of the passenger elevator for excursions, Prazdroj Plzeň (year 2007)
- all steel construction for action Bondi Centre Mladá Boleslav (year 2007)
- steel construction of the welding shop and platforms for air handling units, Škoda Auto Kvasiny (year 2007)
- steel construction of the desulphurisation (towers, supports, buildings), Power plant Tušimice (year 2007 – 2008)
- steel construction of the product hall, SIAG Chrudim (year 2008)
- steel platforms and dividing walls, Berlin Germany (year 2008)
- delivery and installation of the piping bridges, Synthos Kralupy nad Vltavou (year 2009)
- steel construction of the desulphurisation (towers, supports, buildings), Power plant Ledvice (year 2010 – 2012)
- steel hall Sandvik Chomutov (year 2010 – 2011)
- steel construction of the piping bridges, gas reservoir Wierzchovice Poland (year 2011)
- steel construction of the product halls, Repesio Hranice na Moravě (year 2011)
- extension of the assembly hall M1, Škoda Auto Mladá Boleslav (year 2012)
- steel construction halls for poultry including cladding, Farm Semechnice (year 2012 – 2013)
- steel constructin of the desulphurisation (towers, supports, buildings)
- Power plant Prunéřov (year 2012 – 2015)
- steel construction of the conveyor bridges, towers, buildings includin cladding , sugar factories Vrbátky, Litovel, České Meziříčí (year 2013 – 2014)
- steel construction of the product hall, Mahle Behr Mošnov (year 2014 – 2015)
- steel construction of the paiting line, Kubota Bierne France (year 2014 – 2015)
- steel construction of the warehouse, Prologis Jeneč (year 2014)
- complete reconstruction of steel structures of the platforms, Central Station Prague (year 2015 – 2017)
- steel platforms in the paint shop, Volkswagen Wrzesnia Poland (year 2015)
- steel platforms in the paint shop, SNCF Bischhain France (year 2015)
- steel structure of the warehouse bodies, Škoda Auto Mladá Boleslav (year 2016)
- steel construction of the farm buildings, Farm Bukovec (year 2016)
- steel construction of the elliptical skylights and shopfronts, Shopping Centre Prague Chodov (year 2016 – 2017)
- steel structure of the bottler, Prazdroj Pilsen (year 2016 – 2017)
- steel construction of the welding shop, Jaguar Nitra Slovakia (year 2016 – 2017)
- steel construction of the technology platforms, Volkswagen Bratislava Slovakia
Assembly Work – Conveyer Systems and Technological Equipment
- the system of the belt conveyors, transporf of the gypsun
- cement factory Práchovice (year 1999)
- mouting of the technology and transport of the MBM, silos
- the rendering plant Věž (year 2000 – 2003)
- the systém of the belt conveyors, transport of the coal, Orsil Častolovice (in 2000)
- the system of the overhead chain coveyors 9,5km, Philips Hranice na Moravě (year 2001 – 2002)
- assembly of the technological pletforms and paint booths
- IVECO Vysoké Mýto (year 2002)
- reconstrution of the silo for molasses, sugar factory Hrochův Týnec (year 2003)
- assembly of the the ship unloaders for cement and grain
- for the Dutch company de Rujter (year 2003 – 2007)
- instalation of the conveying equipment to transport paper bags, Austria, Italy, Holland, France, Greece, Spain (year 2003 – 2006)
- assembly of the air condenser, Heating plant Plzeň (year 2004)
- assembly of the overhead conveyors and drying furnace, Autopal Hluk (year 2004 – 2006)
- assembly of the curing furnace, Saint Gobain Orange France (year 2005)
- disassemly and reassembly of the solidification line, Koramo Kolín (year 2005)
- assembly of the spray robots, IVECO Vysoké Mýto (year 2005)
- the system of the belt conveyors , Precheza Přerov (year 2005)
- assembly of the curing furnace, Isover Runcorn England (year 2006)
- disassembly of the conveyor system and foundry device
- foundry Lucern Swiss (year 2006)
- assembly of the curing furnace, Knauf Moscow Russia (year 2006)
- refurbishment of the molding lines and instalation
- the foundry Mencl Guss Roudnice nad Labem (year 20007 – 2008)
- assembly of the curing furnace, Saint Gobain Forsa Finland (year 2007)
- assembly of the curing furnace, Saint Gobain Azuqueca Spain year 2007)
- exchange stirrers alkalis, Mondi Štětí (year 2007 – 2010)
- reconstrution of the curing furnace , Saint Avold France (year 2008)
- instalation of the curing furnace, Saint Gobain Chemille France (year 2008)
- instalation of the curing furnace, Chalon ser Saone France (year 2008)
- assembling of the air condenser and steam pipeline
- Incinerator Liberec (year 2009)
- installation of the gas coolers, Velké Kapušana Slovakia (year 2009)
- installation of the cooling towers, US Steel Košice, Slovnaft Bratislava, Dalkia Žiar nad Hronom Slovakia, Hamburger Dunaujváros Hungary (year 2009 – 2015)
- installation of the conveyor systém desulphurisation, Power plant Ledvice (year 2010 – 2012)
- installation of the lines for pellets, Liesno Belarus (year 2012)
- instalation of the curing furnace, Saint Gobain Etten Holland (year 2013)
- system of the conveyors , SAS Plazy (year 2013 – 2015)
- reconstruction of the conveyor equipment, Limeworks Čertovy schody Tmáň (year 2015)
- installation of the over head conveyors, Magna Nymburk CZ, Magna Nizhny Novgorod (year 2015 – 2017)
- assembly of the over head runways, Slaughterhouse Zeman Příbram (year 2016)